Statistics R&D

In June of 2007, we have successfully reconfigured a Carrier Gen III Controls system and saved our customer approx. $24,000.00 per year in energy savings.  We worked closely with the in-house engineer to gather the necessary information such as; occupancy schedules, and temperature set-points for both occupied and unoccupied times.  With this information in hand, we were able to provide the customer with a database of all controls polled on the network and reconfigure the existing settings to optimize the equipment usage and reduce electricity consumption for 2 buildings.  The buildings previously ran the cooling towers 24 hours per day, 7 days a week including holidays.  By reducing the equipment run time to 12 hours per weekday, half day Saturday, and off on Sunday we can assure that equipment maintenance can be extended and increase core component longevity.  These savings are based on an average "Winter" cost of $0.12 / kWh, with 480 Volt 3 Phase power service.  Shown below are the devices shed and their consumption rates.

Cooling Tower Pump Motor  -  1.5A - .72 kWh X .12 Cents = $0.09/Hr to Operate x 102 Hrs = $8.81 per Week Cost to Operate
Cooling Tower Hi Speed Fan - 22A - 10.56 kWh X .12 Cents = $1.27/Hr to Operate X 6 Hrs = $7.60 per Week Cost to Operate
Cooling Tower Lo Speed Fan - 5.5A - 2.64 kWh X .12 Cents = $0.32/Hr to Operate X 12 Hrs = $3.80 per Week Cost to Operate
Closed Loop Circulation Pump - 34A - 16.32 kWh X .12 Cents = $1.96/Hr to Operate X 102 Hrs = $199.76 per Week Cost to Operate

  $8.81
+$7.60
+$3.80
+$199.76
=$219.97 Per Week Savings X 52 Weeks = $11,438.67 Per Year Savings / 12 Months = $953.00 Per Month Savings

NOTE: These savings do not reflect Southern California Edison's "Summer" rates which could be as high as $0.16/kWh.

The customers total investment in implementing this project would pay for itself in just 1 months time.  We were able to guarantee a R.O.I. of 12 Times in the first year alone.